W47 0.02 0.00% | CELL 0.03 0.00% | EVKRF 0.02 0.00% |
W47 0.02 0.00% | CELL 0.03 0.00% | EVKRF 0.02 0.00%

Grid Battery Metals Exploration Team Prepares for its Third Phase of the 2024 Exploration Plan on the Clayton Valley Lithium Project

Grid Battery Metals Inc. (the “Company” or “Grid”) (TSXV:CELL)(OTCQB:EVKRF)(FRA:NMK2) announces its results from its second phase of exploration and its plans for the third phase of its spring/summer exploration program at its Clayton Valley Lithium Property near Silver Peak, Nevada, which includes a four-hole drill program planned for September 2024. At the Clayton Valley Lithium […]